Assessment Year | 2024 |
---|---|
Principal Product | Softwood Building Products |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $5 M to 10M |
# of Employees | 46 |
Plant Area |
165,000
ft2
|
Annual Production | 32,200
units
|
Production Hrs. Annual | 6,205
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $179,406 | 2,279,700 |
kWh
|
$0.079 |
Electricity Demand | $60,100 | 9,894 |
kW-mo/yr
|
$6.07 |
Electricity Fees | $15,461 | - |
|
- |
Natural Gas | $20,150 | 5,637 |
MMBtu
|
$3.57 |
Other Gas | $22,159 | 5,637 |
MMBtu
|
$3.93 |
TOTAL YEARLY COSTS | $297,276 | |||
RECOMMENDED SAVINGS* | $35,208 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2113: Repair or replace steam traps | $6,073 | $3,600 | - | - |
$6,073
-
MMBtu
|
- | |
02 | 2.2511: Insulate bare equipment | $815 | $4,530 | - | - |
$815
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,336 | $2,080 |
$4,826
61,320
kWh
|
$510
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,335 | - |
$1,206
15,520
kWh
|
$129
-
kW-mo/yr
|
- | - | |
05 | 2.2136: Install / repair insulation on steam lines | $2,420 | $1,600 | - | - |
$2,420
-
MMBtu
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $8,451 | $2,000 |
$523
6,643
kWh
|
$78
-
kW-mo/yr
|
- | $7,850 | |
07 | 2.7135: Install occupancy sensors | $8,042 | $6,294 |
$6,997
88,908
kWh
|
$1,045
-
kW-mo/yr
|
- | - | |
08 | 2.4226: Use / purchase optimum sized compressor | $2,736 | $2,075 |
$2,481
31,529
kWh
|
$255
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $35,208 | $22,179 |
$16,033
203,920
kWh
|
$2,017
-
kW-mo/yr
|
$9,308
-
MMBtu
|
$7,850 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs