ITAC Assessment: UW2412
ITAC logo
ITAC Assessment: UW2412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Softwood Building Products
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 46
Plant Area 165,000
ft2
Annual Production 32,200
units
Production Hrs. Annual 6,205
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,406 2,279,700
kWh
Electricity Demand $60,100 9,894
kW-mo/yr
Electricity Fees $15,461 -
Natural Gas $20,150 5,637
MMBtu
Other Gas $22,159 5,637
MMBtu
TOTAL YEARLY COSTS $297,276
RECOMMENDED SAVINGS* $35,208 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2113: Repair or replace steam traps $6,073 $3,600 - - $6,073
-
MMBtu
-
02 2.2511: Insulate bare equipment $815 $4,530 - - $815
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,336 $2,080 $4,826
61,320
kWh
$510
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,335 - $1,206
15,520
kWh
$129
-
kW-mo/yr
- -
05 2.2136: Install / repair insulation on steam lines $2,420 $1,600 - - $2,420
-
MMBtu
-
06 2.4133: Use most efficient type of electric motors $8,451 $2,000 $523
6,643
kWh
$78
-
kW-mo/yr
- $7,850
07 2.7135: Install occupancy sensors $8,042 $6,294 $6,997
88,908
kWh
$1,045
-
kW-mo/yr
- -
08 2.4226: Use / purchase optimum sized compressor $2,736 $2,075 $2,481
31,529
kWh
$255
-
kW-mo/yr
- -
TOTAL RECOMMENDED $35,208 $22,179 $16,033
203,920
kWh
$2,017
-
kW-mo/yr
$9,308
-
MMBtu
$7,850
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs