ITAC Assessment: IC0307
ITAC logo
ITAC Assessment: IC0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Office Space and Server Room
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 65
Plant Area 69,500
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $982,599 10,963,200
kWh
Electricity Demand $341,440 18,528
kW-mo/yr
Electricity Fees $161,040 -
TOTAL YEARLY COSTS $1,485,079
RECOMMENDED SAVINGS* $276,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.2136: Install / repair insulation on steam lines $770 $341 - - $770
02 2.7232: Replace existing hvac unit with high efficiency model $103,396 $127,580 $80,757
897,304
kWh
$22,639
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $4,597 $20,717 $3,423
38,030
kWh
$1,174
-
kW-mo/yr
-
04 2.7241: Install outside air damper / economizer on hvac unit $104,596 $6,854 $95,665
1,062,939
kWh
$8,931
-
kW-mo/yr
-
05 2.7221: Lower temperature during the winter season and vice-versa $36,044 - $28,064
311,819
kWh
$7,980
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $742 $2,210 $389
4,316
kWh
$354
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $5,357 $8,491 $4,680
51,996
kWh
$677
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,279 $335 $947
10,526
kWh
$332
-
kW-mo/yr
-
09 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $10,342 $15,565 $1,870
20,781
kWh
- $8,472
10 2.7134: Use photocell controls $997 $843 $643
7,141
kWh
$354
-
kW-mo/yr
-
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,967 $2,321 $6,222
69,134
kWh
$1,745
-
kW-mo/yr
-
TOTAL RECOMMENDED $276,087 $185,257 $222,659
2,473,986
kWh
$44,186
-
kW-mo/yr
$9,242
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs