ITAC Assessment: UD0379
ITAC logo
ITAC Assessment: UD0379
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FAST FOOD PAPER PACKAGE
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 9,500
ton
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,031 2,121,336
kWh
Natural Gas $9,531 2,140
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,684 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $454 $250 $454
11,430
kWh
02 2.2511: Insulate bare equipment $8,593 $9,000 $8,593
170,281
kWh
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $3,637 $750 $3,637
93,787
kWh
TOTAL RECOMMENDED $12,684 $10,000 $12,684
275,498
kWh
TOTAL IMPLEMENTED $12,230 $9,750 $12,230
264,068
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs