| Assessment Year | 1993 |
|---|---|
| Principal Product | Plastic Cups, Bowls, and Plates |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 600 |
| Plant Area |
250,000
ft2
|
| Annual Production | 6,500,000
lb
|
| Production Hrs. Annual | 6,624
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,574,754 | 46,316,531 |
kWh
|
$0.034 |
| Natural Gas | $63,728 | 15,112 |
MMBtu
|
$4.22 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $50,358 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,499 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,243 | $39,528 |
$13,243
389,508
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,746 | $19,728 |
$6,746
123,974
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,510 | - |
$4,510
137,163
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $15,458 | $7,400 | - |
$15,458
-
MMBtu
|
|
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,401 | $5,910 |
$10,401
-
kWh
|
- | |
| TOTAL RECOMMENDED | $50,358 | $72,566 |
$34,900
650,645
kWh
|
$15,458
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $24,499 | $59,256 |
$24,499
650,645
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs