ITAC Assessment: OK0413
ITAC logo
ITAC Assessment: OK0413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Plastic Cups, Bowls, and Plates
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 250,000
ft2
Annual Production 6,500,000
lb
Production Hrs. Annual 6,624
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,574,754 46,316,531
kWh
Natural Gas $63,728 15,112
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,358 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,499

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,243 $39,528 $13,243
389,508
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,746 $19,728 $6,746
123,974
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,510 - $4,510
137,163
kWh
-
04 2.2437: Recover waste heat from equipment $15,458 $7,400 - $15,458
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,401 $5,910 $10,401
-
kWh
-
TOTAL RECOMMENDED $50,358 $72,566 $34,900
650,645
kWh
$15,458
-
MMBtu
TOTAL IMPLEMENTED $24,499 $59,256 $24,499
650,645
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs