Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Oilfield and industrial single cylinder engines
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 100,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $685,790 25,478,312
kWh
Electricity Demand $326,695 4,012
kW-mo/yr
Electricity Fees $82,093 -
Natural Gas $419,662 114,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.6232: Install set-back timers $12,501 $1,360 - $12,501
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $249 $550 $249
7,620
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $52 - $52
1,172
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $131 $395 $131
3,224
kWh
- -
05 3.8132: Use less toxic and volatile solvent substitutes $7,114 $7,475 - - $7,114
-
gal
TOTAL RECOMMENDED $20,047 $9,780 $432
12,016
kWh
$12,501
-
MMBtu
$7,114
-
gal
TOTAL IMPLEMENTED $12,802 $1,910 $301
8,792
kWh
$12,501
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs