| Assessment Year | 1984 |
|---|---|
| Principal Product | OIL FIELD EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3533: Oil and Gas Field Machinery and Equipment |
| Sales Range | $5 M to 10M |
| # of Employees | 60 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $20,597 | 345,545 |
kWh
|
$0.060 |
| Natural Gas | $6,727 | 1,327 |
MMBtu
|
$5.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,873 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,411 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $680 | $369 | - |
$680
-
MMBtu
|
|
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $462 | $516 | - |
$462
-
MMBtu
|
|
| 03 | 2.7261: Install timers and/or thermostats | $65 | $165 | - |
$65
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $50 | $97 |
$50
1,758
kWh
|
- | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $346 | - |
$346
5,862
kWh
|
- | |
| 06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $43 | $105 |
$43
1,465
kWh
|
- | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $105 | $90 |
$105
3,517
kWh
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $122 | $104 |
$122
2,052
kWh
|
- | |
| TOTAL RECOMMENDED | $1,873 | $1,446 |
$666
14,654
kWh
|
$1,207
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,411 | $930 |
$666
14,654
kWh
|
$745
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs