ITAC Assessment: NC0025
ITAC logo
ITAC Assessment: NC0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Cast Aluminum
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 65,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,247 4,922,626
kWh
Natural Gas $300,697 70,531
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,019 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,071 $420 $2,071
42,204
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $10,423 $8,000 $10,423
212,778
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,042 $710 $2,042
41,618
kWh
-
04 2.4133: Use most efficient type of electric motors $8,019 $13,400 $8,019
162,368
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $317 $660 - $317
-
MMBtu
06 2.1115: Eliminate combustible gas in flue gas $2,797 $750 - $2,797
-
MMBtu
07 2.2414: Use waste heat from hot flue gases to preheat $1,660 $2,500 - $1,660
-
MMBtu
08 2.1213: Direct warmest air to combustion intake $690 $1,500 - $690
-
MMBtu
TOTAL RECOMMENDED $28,019 $27,940 $22,555
458,968
kWh
$5,464
-
MMBtu
TOTAL IMPLEMENTED $14,929 $15,280 $12,132
246,190
kWh
$2,797
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs