Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Print Newspaper Inserts
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 85,000
ft2
Annual Production 4,110,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $330,528 5,057,737
kWh
Electricity Demand $19,212 10,764
kW-mo/yr
Electricity Fees $23,438 -
Natural Gas $150,234 35,314
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $478,935 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $240 $510 $194
4,103
kWh
$46
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,119 $7,670 $3,787
77,081
kWh
$1,332
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $702 $1,425 $519
10,551
kWh
$183
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,747 $13,268 $8,958
182,005
kWh
$1,789
-
kW-mo/yr
- - - -
05 2.7232: Replace existing hvac unit with high efficiency model $16,241 $25,000 $13,151
267,292
kWh
$3,090
-
kW-mo/yr
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,585 $60 $3,697
75,322
kWh
$888
-
kW-mo/yr
- - - -
07 2.4133: Use most efficient type of electric motors $4,449 $6,563 $3,536
77,081
kWh
$913
-
kW-mo/yr
- - - -
08 2.7261: Install timers and/or thermostats $154 $320 $154
3,224
kWh
- - - - -
09 3.5112: Reprocess spent oils on site for re-use $372 $30 - - $372
-
gal
- - -
10 3.1191: Change procedures / equipment / operating conditions $434,826 $450,000 - - - $221,340 - $213,486
11 3.6192: Use a less expensive method of waste removal $1,500 $30 - - - - $1,500 -
TOTAL RECOMMENDED $478,935 $504,876 $33,996
696,659
kWh
$8,241
-
kW-mo/yr
$372
-
gal
$221,340 $1,500 $213,486
TOTAL IMPLEMENTED $27,541 $32,513 $20,732
427,022
kWh
$4,937
-
kW-mo/yr
$372
-
gal
- $1,500 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs