Assessment Year | 1997 |
---|---|
Principal Product | Print Newspaper Inserts |
NAICS |
n/a
|
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 165 |
Plant Area |
85,000
ft2
|
Annual Production | 4,110,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $330,528 | 5,057,737 |
kWh
|
$0.065 |
Electricity Demand | $19,212 | 10,764 |
kW-mo/yr
|
$1.78 |
Electricity Fees | $23,438 | - |
|
- |
Natural Gas | $150,234 | 35,314 |
MMBtu
|
$4.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $478,935 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,541 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $240 | $510 |
$194
4,103
kWh
|
$46
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,119 | $7,670 |
$3,787
77,081
kWh
|
$1,332
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7135: Install occupancy sensors | $702 | $1,425 |
$519
10,551
kWh
|
$183
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,747 | $13,268 |
$8,958
182,005
kWh
|
$1,789
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $16,241 | $25,000 |
$13,151
267,292
kWh
|
$3,090
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,585 | $60 |
$3,697
75,322
kWh
|
$888
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $4,449 | $6,563 |
$3,536
77,081
kWh
|
$913
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7261: Install timers and/or thermostats | $154 | $320 |
$154
3,224
kWh
|
- | - | - | - | - | |
09 | 3.5112: Reprocess spent oils on site for re-use | $372 | $30 | - | - |
$372
-
gal
|
- | - | - | |
10 | 3.1191: Change procedures / equipment / operating conditions | $434,826 | $450,000 | - | - | - | $221,340 | - | $213,486 | |
11 | 3.6192: Use a less expensive method of waste removal | $1,500 | $30 | - | - | - | - | $1,500 | - | |
TOTAL RECOMMENDED | $478,935 | $504,876 |
$33,996
696,659
kWh
|
$8,241
-
kW-mo/yr
|
$372
-
gal
|
$221,340 | $1,500 | $213,486 | ||
TOTAL IMPLEMENTED | $27,541 | $32,513 |
$20,732
427,022
kWh
|
$4,937
-
kW-mo/yr
|
$372
-
gal
|
- | $1,500 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |