Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,231

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0600 #01 Y:2025 Install an uninteruptable power supply $274,416 $2,377,539
LT8415 #04 Y:2024 Change rate schedules or other changes in utility service $7,019 -
LT8415 #03 Y:2024 Turn off equipment when not in use $297 $496
LT8415 #02 Y:2024 Make a practice of turning off lights when not needed $1,473 -
LT8415 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $19,477 $355
LT8416 #03 Y:2024 Re-arrange equipment layout to reduce handling costs $28,423 $1,070
LT8416 #02 Y:2024 Reduce heat gain by window tinting $463 $400
LT8416 #01 Y:2024 Install occupancy sensors $164 $118
NT0036 #04 Y:2024 Optimize plant power factor $6,170 $16,268
NT0036 #03 Y:2024 Turn off equipment during breaks, reduce operating time $3,825 -
NT0036 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,972 $5,609
NT0036 #01 Y:2024 Reduce space conditioning during non-working hours $688 -
OR0801 #06 Y:2024 Use solar heat to make electricty $6,884 $92,435
OR0801 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,786 $5,438
OR0801 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $2,400 $6,763
OR0801 #03 Y:2024 Optimize plant power factor $15,143 $44,093
OR0801 #02 Y:2024 Provide proper maintenance of motor driven equipment $42,000 $50,000
OR0801 #01 Y:2024 Modify process to reduce material use/cost $1,848 -
DL0245 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,824 $1,592
DL0245 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $4,607 $6,000