ITAC Assessment: AS0615
ITAC logo
ITAC Assessment: AS0615
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product prefabricated wood buildings
NAICS 321992: Prefabricated Wood Building Manufacturing
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 214
Plant Area 74,865
ft2
Annual Production 710
units
Production Hrs. Annual 2,406
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,595 426,880
kWh
Electricity Demand $25,066 1,865
kW-mo/yr
Electricity Fees $8,467 -
Natural Gas $15,577 2,656
MMBtu
LPG $21,010 700
MMBtu
Fuel Oil #2 $2,648 90
MMBtu
Waste Disposal Costs
Water Usage $12,172 723
Tgal
TOTAL YEARLY COSTS $120,535
RECOMMENDED SAVINGS* $169,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $115,761 $45,100 $(-49.0)
(-590)
kWh
- - $(-1,580.0) - $117,390
02 2.9114: Use solar heat to make electricty $23,645 $149,478 $24,204
290,218
kWh
$2,308
-
kW-mo/yr
- $(-2,867.0) - -
03 2.1321: Replace fossil fuel equipment with electrical equipment $10,695 $218,314 $(-9,265.0)
(-111,086)
kWh
- - - - $19,960
04 2.4224: Upgrade controls on compressors $10,126 $20,000 $5,614
67,320
kWh
$4,512
-
kW-mo/yr
- - - -
05 2.8114: Change rate schedules or other changes in utility service $7,667 $2,448 - - $7,667 - - -
06 3.4113: Treat and reuse rinse waters $984 $6,104 - - - - $606
-
Tgal
$378
07 2.7124: Make a practice of turning off lights when not needed $454 $67 $454
5,444
kWh
- - - - -
08 2.6232: Install set-back timers $246 $890 $187
2,240
kWh
$59
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $169,578 $442,401 $21,145
253,546
kWh
$6,879
-
kW-mo/yr
$7,667 $(-4,447.0) $606
-
Tgal
$137,728
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs