| Assessment Year | 2026 |
|---|---|
| Principal Product | Die Manufacturing for Doors |
| NAICS | 321911: Wood Window and Door Manufacturing |
| SIC | 2431: Millwork |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
450,000
ft2
|
| Annual Production | 500
units
|
| Production Hrs. Annual | 3,380
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $107,330 | 2,012,404 |
kWh
|
$0.053 | |
| Electricity Demand | $115,644 | 5,524 |
kW-mo/yr
|
$20.94 | |
| Electricity Fees | $24,181 | - |
|
- | |
| Natural Gas | $60,677 | 8,960 |
MMBtu
|
$6.77 | |
| Other Gas | $5,878 | 1 |
MMBtu
|
$5,877.59 | |
| Waste Disposal Costs | |||||
| Water Usage | $5,779 | 509 |
Tgal
|
$11.36 | |
| Water Disposal | $5,775 | 523 |
Tgal
|
$11.03 | |
| TOTAL YEARLY COSTS | $325,264 | ||||
| RECOMMENDED SAVINGS* | $12,715 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,908 | $2,274 |
$1,417
26,730
kWh
|
$838
-
kW-mo/yr
|
$(-347.0)
-
MMBtu
|
|
| 02 | 2.2511: Insulate bare equipment | $110 | $193 |
$55
1,039
kWh
|
$55
-
kW-mo/yr
|
- | |
| 03 | 2.2136: Install / repair insulation on steam lines | $1,674 | $2,169 | - | - |
$1,674
-
MMBtu
|
|
| 04 | 2.2123: Insulate feedwater tank | $184 | $429 | - | - |
$184
-
MMBtu
|
|
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,275 | $747 |
$1,513
28,548
kWh
|
$2,762
-
kW-mo/yr
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,490 | $400 |
$1,436
27,097
kWh
|
$1,054
-
kW-mo/yr
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $651 | $760 |
$223
4,206
kWh
|
$428
-
kW-mo/yr
|
- | |
| 08 | 2.6231: Utilize controls to operate equipment only when needed | $168 | $1,060 |
$14
265
kWh
|
$154
-
kW-mo/yr
|
- | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $119 | - |
$51
960
kWh
|
$68
-
kW-mo/yr
|
- | |
| 10 | 2.4323: Use optimum size and capacity equipment | $94 | $507 |
$40
761
kWh
|
$54
-
kW-mo/yr
|
- | |
| 11 | 2.3132: Recharge batteries on during off-peak demand periods | $333 | - | - |
$333
-
kW-mo/yr
|
- | |
| 12 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $465 | $251 |
$192
3,628
kWh
|
$272
-
kW-mo/yr
|
- | |
| 13 | 2.4239: Eliminate or reduce compressed air usage | $245 | - |
$24
447
kWh
|
$221
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $12,715 | $8,790 |
$4,965
93,679
kWh
|
$6,240
-
kW-mo/yr
|
$1,511
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs