Assessment Year | 1992 |
---|---|
Principal Product | NARROW FABRICS |
NAICS |
n/a
|
SIC | 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber |
Sales Range | $10 M to 50M |
# of Employees | 260 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $455,020 | 7,273,740 |
kWh
|
$0.063 |
Natural Gas | $326,906 | 107,402 |
MMBtu
|
$3.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,494 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,406 | $33,680 |
$5,406
86,460
kWh
|
- | |
02 | 2.6232: Install set-back timers | $2,370 | $1,200 |
$2,370
38,101
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $1,673 | $46,520 |
$1,673
26,964
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $35 | $50 |
$35
586
kWh
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $1,210 | $225 | - |
$1,210
-
MMBtu
|
|
06 | 2.2511: Insulate bare equipment | $310 | $980 | - |
$310
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $6,400 | $25,960 | - |
$6,400
-
MMBtu
|
|
08 | 2.2514: Cover open tanks | $4,880 | $1,500 | - |
$4,880
-
MMBtu
|
|
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,210 | $1,000 | - |
$3,210
-
MMBtu
|
|
10 | 2.2444: Use hot process fluids to preheat incoming process fluids | $12,000 | $6,000 | - |
$12,000
-
MMBtu
|
|
TOTAL RECOMMENDED | $37,494 | $117,115 |
$9,484
152,111
kWh
|
$28,010
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs