ITAC Assessment: AS0528
ITAC logo
ITAC Assessment: AS0528
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Higher Education
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range $1
M
to 5
M
# of Employees 140
Plant Area 100,792
ft2
Annual Production 1
units
Production Hrs. Annual 2,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,650 1,090,800
kWh
Electricity Demand $23,992 2,999
kW-mo/yr
Electricity Fees $20,040 -
Natural Gas $25,935 2,799
MMBtu
Other Energy $5,399 1
MMBtu
TOTAL YEARLY COSTS $155,016
RECOMMENDED SAVINGS* $25,416 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $9,232 $27,889 $7,810
106,990
kWh
- $1,422
-
MMBtu
-
02 2.7241: Install outside air damper / economizer on hvac unit $8,295 $7,150 $842
11,541
kWh
- $7,453
-
MMBtu
-
03 2.7423: Reduce heat gain by window tinting $3,091 $5,725 $2,467
33,799
kWh
$624
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,850 $2,800 $1,274
17,454
kWh
$576
-
kW-mo/yr
- -
05 2.1133: Adjust burners for efficient operation $924 $460 - - $1,224
-
MMBtu
$(-300.0)
06 2.6214: Shut off pilots in standby equipment $918 $105 - - $918
-
MMBtu
-
07 2.6218: Turn off equipment when not in use $894 $700 $806
11,030
kWh
$88
-
kW-mo/yr
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $212 $845 $140
1,916
kWh
$72
-
kW-mo/yr
- -
TOTAL RECOMMENDED $25,416 $45,674 $13,339
182,730
kWh
$1,360
-
kW-mo/yr
$11,017
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs