ITAC Assessment: CO0607
ITAC logo
ITAC Assessment: CO0607
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Hardwood molding and millwork
NAICS 321918: Other Millwork (including Flooring)
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 36,000
ft2
Annual Production 3,500,000
thousand feet
Production Hrs. Annual 2,275
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,838 537,600
kWh
Electricity Demand $41,854 2,830
kW-mo/yr
Electricity Fees $337 -
Natural Gas $26,133 33,370
MMBtu
Fuel Oil #2 $63,870 3,134
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7442: Keep doors and windows shut when not on use $8,830 $10,000 - - $8,830
-
MMBtu
- - -
02 2.8226: Increase efficiency of trucks $3,780 - - - - $3,780
-
MMBtu
- -
03 2.7243: Improve air circulation with destratification fans / other methods $2,590 $10,010 $(-250.0)
(-8,000)
kWh
$(-170.0)
-
kW-mo/yr
$3,010
-
MMBtu
- - -
04 2.9114: Use solar heat to make electricty $1,650 $11,000 $450
14,600
kWh
$1,200
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $610 $3,710 $170
5,600
kWh
$410
-
kW-mo/yr
- - $10 $20
06 2.7142: Utilize higher efficiency lamps and/or ballasts $580 $1,710 $220
7,200
kWh
$340
-
kW-mo/yr
- - $20 -
TOTAL RECOMMENDED $18,040 $36,430 $590
19,400
kWh
$1,780
-
kW-mo/yr
$11,840
-
MMBtu
$3,780
-
MMBtu
$30 $20
TOTAL IMPLEMENTED $8,830 $10,000 - - $8,830
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs