ITAC Assessment: UM0467
ITAC logo
ITAC Assessment: UM0467
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product tools for the meat processing industry, batter breaders, specialty shear
NAICS 333241: Food Product Machinery Manufacturing
SIC 3556: Food Products Machinery
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 90,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,900 3,822,688
kWh
Natural Gas $31,700 5,086
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,686 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 2.7135: Install occupancy sensors $1,731 $1,080 $1,620
20,506
kWh
- - $34 $77 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $257 $1,170 $185
2,342
kWh
- - $13 $59 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,341 $1,946 $646
8,178
kWh
- - $169 $526 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,908 $7,823 $3,908
49,464
kWh
- - - - -
05 2.2514: Cover open tanks $4,591 $524 $4,591
58,121
kWh
- - - - -
06 2.4221: Install compressor air intakes in coolest locations $1,544 $2,000 $1,544
19,550
kWh
- - - - -
07 2.2511: Insulate bare equipment $56 $100 $56
703
kWh
- - - - -
08 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $1,938 $5,400 - $1,938
-
MMBtu
- - - -
09 3.5217: Reuse / recycle/ sell paper products $4,320 $7,050 - - $3,000
-
lb
- - $1,320
TOTAL RECOMMENDED $19,686 $27,093 $12,550
158,864
kWh
$1,938
-
MMBtu
$3,000
-
lb
$216 $662 $1,320
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs