34
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Apparel accessories and other apparel manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0246 #07 Y:2024 | 07 | 2024 | Use automatic flow control | $4,727 | $4,633 |
n/a
|
UU0246 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $8,970 | $42,406 |
n/a
|
UU0246 #05 Y:2024 | 05 | 2024 | Turn off equipment during breaks, reduce operating time | $1,731 | $338 |
n/a
|
UU0246 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $520 | $123 |
n/a
|
UU0246 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,628 | $3,000 |
n/a
|
UU0246 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $3,514 | $9,000 |
n/a
|
UU0246 #01 Y:2024 | 01 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $439 | $900 |
n/a
|
UU0171 #04 Y:2020 | 04 | 2020 | Reduce the pressure of compressed air to the minimum required | $1,725 | $1,500 | |
UU0171 #03 Y:2020 | 03 | 2020 | Change rate schedules or other changes in utility service | $6,190 | $1,100 | |
UU0171 #02 Y:2020 | 02 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,969 | $4,000 | |
UU0171 #01 Y:2020 | 01 | 2020 | Eliminate/reduce an operation | $43,211 | $85,000 | |
UA0067 #04 Y:2011 | 04 | 2011 | Use radiant heater for spot heating | $6,396 | $9,456 | |
UA0067 #03 Y:2011 | 03 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $726 | $1,100 | |
UA0067 #02 Y:2011 | 02 | 2011 | Reduce the pressure of compressed air to the minimum required | $4,859 | $480 | |
UA0067 #01 Y:2011 | 01 | 2011 | Lower temperature during the winter season and vice-versa | $7,432 | $120 | |
DL0023 #07 Y:2008 | 07 | 2008 | Install compressor air intakes in coolest locations | $590 | $150 | |
DL0023 #06 Y:2008 | 06 | 2008 | Reduce the pressure of compressed air to the minimum required | $1,400 | $500 | |
DL0023 #05 Y:2008 | 05 | 2008 | Utilize higher efficiency lamps and/or ballasts | $9,500 | $22,600 | |
DL0023 #04 Y:2008 | 04 | 2008 | Relocate oven / furnace to more efficient location | $31,000 | $26,000 | |
DL0023 #03 Y:2008 | 03 | 2008 | Turn off equipment when not in use | $6,900 | - |