ITAC Assessment: UA0067
ITAC logo
ITAC Assessment: UA0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Protective Apparel
NAICS 315990: Apparel Accessories and Other Apparel Manufacturing
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 150
Plant Area 114,920
ft2
Annual Production 5,000
units
Production Hrs. Annual 2,250
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,405 1,025,684
kWh
Electricity Demand $28,077 4,150
kW-mo/yr
Natural Gas $37,206 3,802
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,017

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $7,432 $120 $2,991
34,710
kWh
$874
-
kW-mo/yr
$349 $3,218
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,859 $480 $3,403
39,487
kWh
$1,228
-
kW-mo/yr
$228 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $726 $1,100 $605
7,023
kWh
$87
-
kW-mo/yr
$34 -
04 2.7231: Use radiant heater for spot heating $6,396 $9,456 - - - $6,396
-
MMBtu
TOTAL RECOMMENDED $19,413 $11,156 $6,999
81,220
kWh
$2,189
-
kW-mo/yr
$611 $9,614
-
MMBtu
TOTAL IMPLEMENTED $13,017 $1,700 $6,999
81,220
kWh
$2,189
-
kW-mo/yr
$611 $3,218
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs