ITAC Assessment: UU0171
ITAC logo
ITAC Assessment: UU0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Clothing
NAICS 315990: Apparel Accessories and Other Apparel Manufacturing
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 650
Plant Area 340,300
ft2
Annual Production 9,400,000
units
Production Hrs. Annual 5,600
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,373 5,904,000
kWh
Electricity Demand $254,170 14,991
kW-mo/yr
Electricity Fees $38,198 -
Natural Gas $103,636 31,938
MMBtu
Waste Disposal Costs
Water Usage $11,802 5,726
Tgal
Water Disposal $26,986 6,609
Tgal
TOTAL YEARLY COSTS $659,164
RECOMMENDED SAVINGS* $58,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Administrative Changes Savings
01 3.1161: Eliminate/reduce an operation $43,211 $85,000 $6,677
175,746
kWh
$6,386
-
kW-mo/yr
$28,348
-
MMBtu
$1,800
-
Tgal
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,969 $4,000 $3,510
92,365
kWh
$3,459
-
kW-mo/yr
- - -
03 2.8114: Change rate schedules or other changes in utility service $6,190 $1,100 - - - - $6,190
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,725 $1,500 $746
19,634
kWh
$979
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $58,095 $91,600 $10,933
287,745
kWh
$10,824
-
kW-mo/yr
$28,348
-
MMBtu
$1,800
-
Tgal
$6,190
TOTAL IMPLEMENTED $50,180 $89,000 $10,187
268,111
kWh
$9,845
-
kW-mo/yr
$28,348
-
MMBtu
$1,800
-
Tgal
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs