| Assessment Year | 2020 |
|---|---|
| Principal Product | Clothing |
| NAICS | 315990: Apparel Accessories and Other Apparel Manufacturing |
| SIC | 2389: Apparel and Accessories, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 650 |
| Plant Area |
340,300
ft2
|
| Annual Production | 9,400,000
units
|
| Production Hrs. Annual | 5,600
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $224,373 | 5,904,000 |
kWh
|
$0.038 | |
| Electricity Demand | $254,170 | 14,991 |
kW-mo/yr
|
$16.95 | |
| Electricity Fees | $38,198 | - |
|
- | |
| Natural Gas | $103,636 | 31,938 |
MMBtu
|
$3.24 | |
| Waste Disposal Costs | |||||
| Water Usage | $11,802 | 5,726 |
Tgal
|
$2.06 | |
| Water Disposal | $26,986 | 6,609 |
Tgal
|
$4.08 | |
| TOTAL YEARLY COSTS | $659,164 | ||||
| RECOMMENDED SAVINGS* | $58,095 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $50,180 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.1161: Eliminate/reduce an operation | $43,211 | $85,000 |
$6,677
175,746
kWh
|
$6,386
-
kW-mo/yr
|
$28,348
-
MMBtu
|
$1,800
-
Tgal
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,969 | $4,000 |
$3,510
92,365
kWh
|
$3,459
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.8114: Change rate schedules or other changes in utility service | $6,190 | $1,100 | - | - | - | - | $6,190 | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,725 | $1,500 |
$746
19,634
kWh
|
$979
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $58,095 | $91,600 |
$10,933
287,745
kWh
|
$10,824
-
kW-mo/yr
|
$28,348
-
MMBtu
|
$1,800
-
Tgal
|
$6,190 | ||
| TOTAL IMPLEMENTED | $50,180 | $89,000 |
$10,187
268,111
kWh
|
$9,845
-
kW-mo/yr
|
$28,348
-
MMBtu
|
$1,800
-
Tgal
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs