Assessment Year | 2001 |
---|---|
Principal Product | Aircraft and Airport Lighting Systems |
NAICS |
n/a
|
SIC | 3359: |
Sales Range | $10 M to 50M |
# of Employees | 208 |
Plant Area |
74,880
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,613 | 1,783,260 |
kWh
|
$0.057 |
Electricity Demand | $51,351 | 6,324 |
kW-mo/yr
|
$8.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $272,529 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $129,955 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.432: Cross-train personnel to avoid lost time | $91,260 | $30 | - | - | - | $91,260 | |
02 | 4.514: Re-arrange equipment layout to reduce handling costs | $60,831 | $6,664 |
$11,057
193,986
kWh
|
- | - | $49,774 | |
03 | 3.1161: Eliminate/reduce an operation | $6,170 | $120 | - | - |
$6,170
-
Tgal
|
- | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $20,783 | $13 |
$13,006
228,181
kWh
|
$7,777
-
kW-mo/yr
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $4,778 | $520 |
$3,500
61,402
kWh
|
$1,278
-
kW-mo/yr
|
- | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $6,964 | $520 |
$5,101
89,482
kWh
|
$1,863
-
kW-mo/yr
|
- | - | |
07 | 4.511: Expand operations into unused space | $81,743 | $42,000 |
$6,752
118,456
kWh
|
$5,223
-
kW-mo/yr
|
- | $69,768 | |
TOTAL RECOMMENDED | $272,529 | $49,867 |
$39,416
691,507
kWh
|
$16,141
-
kW-mo/yr
|
$6,170
-
Tgal
|
$210,802 | ||
TOTAL IMPLEMENTED | $129,955 | $1,203 |
$21,607
379,065
kWh
|
$10,918
-
kW-mo/yr
|
$6,170
-
Tgal
|
$91,260 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs