ITAC Assessment: MI0017
ITAC logo
ITAC Assessment: MI0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aircraft and Airport Lighting Systems
NAICS
n/a
SIC 3359:
Sales Range $10
M
to 50
M
# of Employees 208
Plant Area 74,880
ft2
Annual Production 0
units
Production Hrs. Annual 4,680
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,613 1,783,260
kWh
Electricity Demand $51,351 6,324
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $272,529 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $129,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
01 4.432: Cross-train personnel to avoid lost time $91,260 $30 - - - $91,260
02 4.514: Re-arrange equipment layout to reduce handling costs $60,831 $6,664 $11,057
193,986
kWh
- - $49,774
03 3.1161: Eliminate/reduce an operation $6,170 $120 - - $6,170
-
Tgal
-
04 2.7221: Lower temperature during the winter season and vice-versa $20,783 $13 $13,006
228,181
kWh
$7,777
-
kW-mo/yr
- -
05 2.7111: Reduce illumination to minimum necessary levels $4,778 $520 $3,500
61,402
kWh
$1,278
-
kW-mo/yr
- -
06 2.7111: Reduce illumination to minimum necessary levels $6,964 $520 $5,101
89,482
kWh
$1,863
-
kW-mo/yr
- -
07 4.511: Expand operations into unused space $81,743 $42,000 $6,752
118,456
kWh
$5,223
-
kW-mo/yr
- $69,768
TOTAL RECOMMENDED $272,529 $49,867 $39,416
691,507
kWh
$16,141
-
kW-mo/yr
$6,170
-
Tgal
$210,802
TOTAL IMPLEMENTED $129,955 $1,203 $21,607
379,065
kWh
$10,918
-
kW-mo/yr
$6,170
-
Tgal
$91,260
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs