69
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Textile and fabric finishing mills | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0499 #04 Y:2013 | 04 | 2013 | Use heat from boiler blowdown to preheat boiler feed water | $10,670 | $35,000 | |
| NC0499 #03 Y:2013 | 03 | 2013 | Use waste heat from hot flue gases to preheat | $11,043 | - | |
| NC0499 #02 Y:2013 | 02 | 2013 | Operate boilers on high fire setting | $17,607 | $1,000 | |
| NC0499 #01 Y:2013 | 01 | 2013 | Use hot process fluids to preheat incoming process fluids | $52,036 | $15,000 | |
| NC0357 #05 Y:2006 | 05 | 2006 | Change rate schedules or other changes in utility service | $277 | $100 | |
| NC0357 #04 Y:2006 | 04 | 2006 | Utilize higher efficiency lamps and/or ballasts | $2,527 | $4,761 | |
| NC0357 #03 Y:2006 | 03 | 2006 | Develop a repair/replace policy | $699 | $375 | |
| NC0357 #02 Y:2006 | 02 | 2006 | Clean and maintain refrigerant condensers and towers | $16,558 | $5,600 | |
| NC0357 #01 Y:2006 | 01 | 2006 | Reduce the pressure of compressed air to the minimum required | $30,234 | $78,000 | |
| NC0294 #05 Y:2004 | 05 | 2004 | Recover waste heat from equipment | $8,102 | $9,225 | |
| NC0294 #04 Y:2004 | 04 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $600 | $100 | |
| NC0294 #03 Y:2004 | 03 | 2004 | Redesign process | $9,178 | $2,200 | |
| NC0294 #02 Y:2004 | 02 | 2004 | Add additional production shift | $17,395 | $5,000 | |
| NC0294 #01 Y:2004 | 01 | 2004 | Use closed cycle process to minimize waste water production | $19,084 | $2,780 | |
| NC0285 #08 Y:2004 | 08 | 2004 | Reduce the pressure of compressed air to the minimum required | $1,454 | $500 | |
| NC0285 #07 Y:2004 | 07 | 2004 | Install outside air damper / economizer on hvac unit | $11,507 | $23,675 | |
| NC0285 #06 Y:2004 | 06 | 2004 | Adjust burners for efficient operation | $9,991 | $1,000 | |
| NC0285 #05 Y:2004 | 05 | 2004 | Use waste heat from hot flue gases to preheat | $48,918 | $20,000 | |
| NC0285 #04 Y:2004 | 04 | 2004 | Use flow control valves on equipment to optimize water use | $956 | $1,380 | |
| NC0285 #03 Y:2004 | 03 | 2004 | Recover and reuse cooling water | $29,869 | $5,075 |