Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Textile and fabric finishing mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0499 #04 Y:2013 Use heat from boiler blowdown to preheat boiler feed water $10,670 $35,000
NC0499 #03 Y:2013 Use waste heat from hot flue gases to preheat $11,043 -
NC0499 #02 Y:2013 Operate boilers on high fire setting $17,607 $1,000
NC0499 #01 Y:2013 Use hot process fluids to preheat incoming process fluids $52,036 $15,000
NC0357 #05 Y:2006 Change rate schedules or other changes in utility service $277 $100
NC0357 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $2,527 $4,761
NC0357 #03 Y:2006 Develop a repair/replace policy $699 $375
NC0357 #02 Y:2006 Clean and maintain refrigerant condensers and towers $16,558 $5,600
NC0357 #01 Y:2006 Reduce the pressure of compressed air to the minimum required $30,234 $78,000
NC0294 #05 Y:2004 Recover waste heat from equipment $8,102 $9,225
NC0294 #04 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $600 $100
NC0294 #03 Y:2004 Redesign process $9,178 $2,200
NC0294 #02 Y:2004 Add additional production shift $17,395 $5,000
NC0294 #01 Y:2004 Use closed cycle process to minimize waste water production $19,084 $2,780
NC0285 #08 Y:2004 Reduce the pressure of compressed air to the minimum required $1,454 $500
NC0285 #07 Y:2004 Install outside air damper / economizer on hvac unit $11,507 $23,675
NC0285 #06 Y:2004 Adjust burners for efficient operation $9,991 $1,000
NC0285 #05 Y:2004 Use waste heat from hot flue gases to preheat $48,918 $20,000
NC0285 #04 Y:2004 Use flow control valves on equipment to optimize water use $956 $1,380
NC0285 #03 Y:2004 Recover and reuse cooling water $29,869 $5,075