ITAC Assessment: NC0294
ITAC logo
ITAC Assessment: NC0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Socks
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 100,000
ft2
Annual Production 15,600,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,746 4,609,500
kWh
Electricity Demand $84,891 8,928
kW-mo/yr
Electricity Fees $6,544 -
Natural Gas $421,428 54,844
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,359 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,786

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.4111: Use closed cycle process to minimize waste water production $19,084 $2,780 $(-266.0)
(-9,360)
kWh
$(-147.0)
-
kW-mo/yr
$6,298
-
MMBtu
$13,199
-
Tgal
- -
02 4.451: Add additional production shift $17,395 $5,000 $(-1,274.0)
(-55,200)
kWh
- $8,583
-
MMBtu
$10,086
-
Tgal
- -
03 2.5194: Redesign process $9,178 $2,200 $2,346
81,736
kWh
$1,283
-
kW-mo/yr
$5,549
-
MMBtu
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $600 $100 $1,198
42,192
kWh
$662
-
kW-mo/yr
- - $(-960.0) $(-300.0)
05 2.2437: Recover waste heat from equipment $8,102 $9,225 - - $8,102
-
MMBtu
- - -
TOTAL RECOMMENDED $54,359 $19,305 $2,004
59,368
kWh
$1,798
-
kW-mo/yr
$28,532
-
MMBtu
$23,285
-
Tgal
$(-960.0) $(-300.0)
TOTAL IMPLEMENTED $27,786 $12,105 $932
32,832
kWh
$515
-
kW-mo/yr
$14,400
-
MMBtu
$13,199
-
Tgal
$(-960.0) $(-300.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs