ITAC Assessment: MA0377
ITAC logo
ITAC Assessment: MA0377
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plating
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 52
Plant Area 35,000
ft2
Annual Production 100,000
lb
Production Hrs. Annual 6,257
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,478 3,036,929
kWh
Electricity Demand $86,636 9,025
kW-mo/yr
Electricity Fees $74,535 -
Natural Gas $113,572 20,805
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,363

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
01 3.4113: Treat and reuse rinse waters $70,000 $198,000 - - - - $70,000
-
Tgal
02 2.2612: Use cooling tower water instead of refrigeration $6,407 $3,770 $6,371
151,817
kWh
$36
-
kW-mo/yr
- - -
03 2.8123: Pay utility bills on time $3,363 - - - - $3,363 -
04 2.2511: Insulate bare equipment $1,650 $1,220 - - $1,650
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $434 $174 $434
10,258
kWh
- - - -
TOTAL RECOMMENDED $81,854 $203,164 $6,805
162,075
kWh
$36
-
kW-mo/yr
$1,650
-
MMBtu
$3,363 $70,000
-
Tgal
TOTAL IMPLEMENTED $3,363 - - - - $3,363 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs