Assessment Year | 1995 |
---|---|
Principal Product | Injection Molded Pipe Brackets and Steel Braided Hose |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
67,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $176,832 | 2,541,325 |
kWh
|
$0.070 |
Natural Gas | $27,586 | 4,756 |
MMBtu
|
$5.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,747 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,330 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,350 | $3,190 |
$1,350
23,447
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $433 | $327 |
$433
8,206
kWh
|
- | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $2,745 | $5,526 | - |
$2,745
-
MMBtu
|
|
04 | 2.7446: Utilize sensors controlling roof and wall openings | $875 | $888 | - |
$875
-
MMBtu
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,424 | $3,622 | - |
$2,424
-
MMBtu
|
|
06 | 2.6218: Turn off equipment when not in use | $6,798 | - |
$6,798
143,904
kWh
|
- | |
07 | 2.2511: Insulate bare equipment | $3,364 | $1,444 |
$3,364
71,219
kWh
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,776 | - |
$1,776
37,515
kWh
|
- | |
09 | 2.3212: Optimize plant power factor | $982 | $3,382 |
$982
-
kWh
|
- | |
TOTAL RECOMMENDED | $20,747 | $18,379 |
$14,703
284,291
kWh
|
$6,044
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,330 | $10,194 |
$10,906
204,866
kWh
|
$2,424
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs