ITAC Assessment: NV0031
ITAC logo
ITAC Assessment: NV0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Injection Molded Pipe Brackets and Steel Braided Hose
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 67,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,832 2,541,325
kWh
Natural Gas $27,586 4,756
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,350 $3,190 $1,350
23,447
kWh
-
02 2.7135: Install occupancy sensors $433 $327 $433
8,206
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $2,745 $5,526 - $2,745
-
MMBtu
04 2.7446: Utilize sensors controlling roof and wall openings $875 $888 - $875
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,424 $3,622 - $2,424
-
MMBtu
06 2.6218: Turn off equipment when not in use $6,798 - $6,798
143,904
kWh
-
07 2.2511: Insulate bare equipment $3,364 $1,444 $3,364
71,219
kWh
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,776 - $1,776
37,515
kWh
-
09 2.3212: Optimize plant power factor $982 $3,382 $982
-
kWh
-
TOTAL RECOMMENDED $20,747 $18,379 $14,703
284,291
kWh
$6,044
-
MMBtu
TOTAL IMPLEMENTED $13,330 $10,194 $10,906
204,866
kWh
$2,424
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs