Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

376

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Textile and fabric finishing and fabric coating mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CL1802 #05 Y:2017 Reduce space conditioning during non-working hours $1,710 $250
CL1802 #04 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $2,272 $2,080
CL1802 #03 Y:2017 Reduce the pressure of compressed air to the minimum required $6,049 -
CL1802 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $6,648 $20,897
CL1802 #01 Y:2017 Reschedule plant operations or reduce load to avoid peaks $14,952 -
TT0199 #05 Y:2017 Utilize energy-efficient belts and other improved mechanisms $4,715 $11,600
TT0199 #04 Y:2017 Use / purchase optimum sized compressor $3,003 $25
TT0199 #03 Y:2017 Optimize plant power factor $5,729 $8,000
TT0199 #02 Y:2017 Repair or replace steam traps $14,682 $4,830
TT0199 #01 Y:2017 Clean fouling from water lines regularly $91,197 $8,500
SD0550 #05 Y:2017 Use waste heat from hot flue gases to preheat $2,077 $9,750
SD0550 #04 Y:2017 Reduce the pressure of compressed air to the minimum required $3,945 $600
SD0550 #03 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $9,225 $2,500
SD0550 #02 Y:2017 Use closed cycle process to minimize waste water production $119,615 $210,000
SD0550 #01 Y:2017 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $526,998 $1,348,560
NC0589 #10 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $1,050 $100
NC0589 #09 Y:2017 Utilize higher efficiency lamps and/or ballasts $541 $300
NC0589 #08 Y:2017 Utilize higher efficiency lamps and/or ballasts $29,155 $66,186
NC0589 #07 Y:2017 Analyze flue gas for proper air/fuel ratio $1,357 $1,000
NC0589 #06 Y:2017 Install / repair insulation on steam lines $3,876 $840