ITAC Assessment: CL1802
ITAC logo
ITAC Assessment: CL1802
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Printing Polyester Fabrics
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 19
Plant Area 70,000
ft2
Annual Production 1,800
thousand feet
Production Hrs. Annual 2,340
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,100 456,000
kWh
Electricity Demand $63,187 2,698
kW-mo/yr
TOTAL YEARLY COSTS $80,287
RECOMMENDED SAVINGS* $31,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,952 - - - $14,952
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,648 $20,897 $6,116
163,079
kWh
$532
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $6,049 - $1,365
36,407
kWh
$4,684
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,272 $2,080 $541
14,414
kWh
$1,731
-
kW-mo/yr
-
05 2.7224: Reduce space conditioning during non-working hours $1,710 $250 $1,710
45,600
kWh
- -
TOTAL RECOMMENDED $31,631 $23,227 $9,732
259,500
kWh
$6,947
-
kW-mo/yr
$14,952
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs