Assessment Year | 2007 |
---|---|
Principal Product | Tape, Laminates, Paper, Film, Fabric, Foil |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
50,000
ft2
|
Annual Production | 100,000,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $229,070 | 2,460,240 |
kWh
|
$0.093 |
Electricity Demand | $56,678 | 7,159 |
kW-mo/yr
|
$7.92 |
Natural Gas | $394,307 | 31,575 |
MMBtu
|
$12.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $145,111 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,182 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1336: Install equipment to utilize waste fuel | $101,767 | $50,000 | - | - |
$101,767
-
MMBtu
|
|
02 | 2.7496: Install partitions to reduce size of conditioned space | $15,602 | $5,000 | - | - |
$15,602
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,536 | $15,000 |
$6,769
72,790
kWh
|
$1,767
-
kW-mo/yr
|
- | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $7,965 | $35,200 |
$2,273
61,200
kWh
|
$5,692
-
kW-mo/yr
|
- | |
05 | 2.7231: Use radiant heater for spot heating | $4,138 | $5,000 | - | - |
$4,138
-
MMBtu
|
|
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,217 | $500 |
$978
10,517
kWh
|
$239
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $689 | $500 |
$541
5,819
kWh
|
$148
-
kW-mo/yr
|
- | |
08 | 2.7135: Install occupancy sensors | $1,207 | $1,200 |
$1,207
12,797
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,990 | $11,733 |
$3,203
34,445
kWh
|
$787
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $145,111 | $124,133 |
$14,971
197,568
kWh
|
$8,633
-
kW-mo/yr
|
$121,507
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,182 | $35,700 |
$3,251
71,717
kWh
|
$5,931
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs