ITAC Assessment: TT0199
ITAC logo
ITAC Assessment: TT0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Cotton and Poly Cotton Book/ Passport Coverings
NAICS 313320: Fabric Coating Mills
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 294,315
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,177 4,637,800
kWh
Electricity Demand $178,661 16,076
kW-mo/yr
Natural Gas $429,304 59,487
MMBtu
TOTAL YEARLY COSTS $916,142
RECOMMENDED SAVINGS* $119,326 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 3.4133: Clean fouling from water lines regularly $91,197 $8,500 - - - $91,197
02 2.2113: Repair or replace steam traps $14,682 $4,830 - - $14,682
-
MMBtu
-
03 2.3212: Optimize plant power factor $5,729 $8,000 - $5,729
-
kW-mo/yr
- -
04 2.4226: Use / purchase optimum sized compressor $3,003 $25 $749
11,267
kWh
$2,254
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,715 $11,600 $2,354
35,400
kWh
$2,361
-
kW-mo/yr
- -
TOTAL RECOMMENDED $119,326 $32,955 $3,103
46,667
kWh
$10,344
-
kW-mo/yr
$14,682
-
MMBtu
$91,197
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs