ITAC Assessment: LE0132
ITAC logo
ITAC Assessment: LE0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Electrically Insulating Varnishes and Resins
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 38
Plant Area 30,250
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,718 709,357
kWh
Electricity Demand $21,843 2,486
kW-mo/yr
Natural Gas $35,769 13,682
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,084

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $599 $728 $461
5,659
kWh
$138
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $675 $130 - - $675
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $901 - $626
7,693
kWh
$275
-
kW-mo/yr
-
04 2.4314: Use synthetic lubricant $448 $400 $282
3,470
kWh
$166
-
kW-mo/yr
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,278 $2,500 - $3,278
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,409 - $888
10,917
kWh
$521
-
kW-mo/yr
-
TOTAL RECOMMENDED $7,310 $3,758 $2,257
27,739
kWh
$4,378
-
kW-mo/yr
$675
-
MMBtu
TOTAL IMPLEMENTED $2,084 $130 $888
10,917
kWh
$521
-
kW-mo/yr
$675
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs