Assessment Year | 2002 |
---|---|
Principal Product | Electrically Insulating Varnishes and Resins |
NAICS |
n/a
|
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $10 M to 50M |
# of Employees | 38 |
Plant Area |
30,250
ft2
|
Annual Production | 11,000,000
lb
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,718 | 709,357 |
kWh
|
$0.081 |
Electricity Demand | $21,843 | 2,486 |
kW-mo/yr
|
$8.79 |
Natural Gas | $35,769 | 13,682 |
MMBtu
|
$2.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,310 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,084 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $599 | $728 |
$461
5,659
kWh
|
$138
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $675 | $130 | - | - |
$675
-
MMBtu
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $901 | - |
$626
7,693
kWh
|
$275
-
kW-mo/yr
|
- | |
04 | 2.4314: Use synthetic lubricant | $448 | $400 |
$282
3,470
kWh
|
$166
-
kW-mo/yr
|
- | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,278 | $2,500 | - |
$3,278
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,409 | - |
$888
10,917
kWh
|
$521
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $7,310 | $3,758 |
$2,257
27,739
kWh
|
$4,378
-
kW-mo/yr
|
$675
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,084 | $130 |
$888
10,917
kWh
|
$521
-
kW-mo/yr
|
$675
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs