| Assessment Year | 1991 |
|---|---|
| Principal Product | MACHINING AND ANODIZING |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | n/a |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 1,200
pieces
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $203,698 | 2,132,474 |
kWh
|
$0.096 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $61,173 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $61,173 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $38,440 | $125,000 |
$38,440
-
kWh
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,565 | $9,500 |
$8,565
89,683
kWh
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,981 | $395 |
$2,981
31,360
kWh
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $428 | $407 |
$428
4,396
kWh
|
|
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $2,865 | - |
$2,865
29,894
kWh
|
|
| 06 | 2.4133: Use most efficient type of electric motors | $231 | $277 |
$231
2,345
kWh
|
|
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,414 | - |
$1,414
14,947
kWh
|
|
| 08 | 2.7422: Plant trees or shrubs near windows to shield from sunlight | $3,287 | $900 |
$3,287
34,291
kWh
|
|
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,962 | $2,000 |
$2,962
31,067
kWh
|
|
| TOTAL RECOMMENDED | $61,173 | $138,479 |
$61,173
237,983
kWh
|
||
| TOTAL IMPLEMENTED | $61,173 | $138,479 |
$61,173
237,983
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs