ITAC Assessment: NC0272
ITAC logo
ITAC Assessment: NC0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product School uniforms
NAICS 315210: Cut and Sew Apparel Contractors
SIC 2369: Girls', Children's, and Infants' Outerwear, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 98,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,068 572,200
kWh
Electricity Demand $15,971 3,266
kW-mo/yr
Electricity Fees $2,670 -
LPG $29,516 2,748
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,121 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $728 $2,803 $462
9,093
kWh
$266
-
kW-mo/yr
- - -
02 2.6218: Turn off equipment when not in use $1,885 $610 $1,885
37,100
kWh
- - - -
03 3.5311: Recover and reuse waste material $990 $400 - - - $390
-
lb
$600
04 2.7134: Use photocell controls $167 $235 $132
2,606
kWh
$35
-
kW-mo/yr
- - -
05 2.2491: Use cooling air which cools hot work pieces for space heating $351 $900 - - $351
-
MMBtu
- -
TOTAL RECOMMENDED $4,121 $4,948 $2,479
48,799
kWh
$301
-
kW-mo/yr
$351
-
MMBtu
$390
-
lb
$600
TOTAL IMPLEMENTED $3,770 $4,048 $2,479
48,799
kWh
$301
-
kW-mo/yr
- $390
-
lb
$600
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs