ITAC Assessment: KU0148
ITAC logo
ITAC Assessment: KU0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product AVIATION ELECTRONICS
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 25,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,060 1,315,944
kWh
Natural Gas $9,535 2,034
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,351

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,910 $36 $4,910
68,875
kWh
- -
02 2.3191: Use demand controller or load shedder $2,754 $3,000 $2,754
-
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $514 $800 - $572
-
MMBtu
$(-58.0)
04 2.1123: Install automatic stack damper $436 $700 - $436
-
MMBtu
-
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $366 $100 - $366
-
MMBtu
-
06 2.2511: Insulate bare equipment $173 $70 $199
2,638
kWh
$(-26.0)
-
MMBtu
-
07 2.2511: Insulate bare equipment $1,738 $1,240 $1,738
24,326
kWh
- -
08 2.2437: Recover waste heat from equipment $99 $150 - $159
-
MMBtu
$(-60.0)
09 2.7441: Replace broken windows and/or window sash $298 $12 $21
293
kWh
$277
-
MMBtu
-
10 2.7314: Reduce ventilation air $2,954 $500 $(-1,089.0)
(-15,240)
kWh
$4,043
-
MMBtu
-
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,658 $15,000 $10,658
149,179
kWh
- -
12 2.7221: Lower temperature during the winter season and vice-versa $4,177 $17 $1,738
24,326
kWh
$2,439
-
MMBtu
-
13 2.7243: Improve air circulation with destratification fans / other methods $1,182 $2,000 - $1,182
-
MMBtu
-
14 2.6121: Reduce hot water temperature to the minimum required $760 - $760
10,551
kWh
- -
15 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,508 $1,900 $2,094
29,308
kWh
$(-586.0)
-
MMBtu
-
TOTAL RECOMMENDED $32,527 $25,525 $23,783
294,256
kWh
$8,862
-
MMBtu
$(-118.0)
TOTAL IMPLEMENTED $18,351 $7,165 $9,094
88,805
kWh
$9,315
-
MMBtu
$(-58.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs