376
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0487 #03 Y:2019 | 03 | 2019 | Repair or replace steam traps | $11,267 | $5,000 | |
| LE0487 #02 Y:2019 | 02 | 2019 | Insulate bare equipment | $5,562 | $1,833 | |
| LE0487 #01 Y:2019 | 01 | 2019 | Lower compressor pressure through a/c system modification | $728 | $40 | |
| GT0932 #06 Y:2019 | 06 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $9,678 | $14,251 | |
| GT0932 #05 Y:2019 | 05 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $899 | $1,117 | |
| GT0932 #04 Y:2019 | 04 | 2019 | Insulate bare equipment | $4,768 | $5,877 | |
| GT0932 #03 Y:2019 | 03 | 2019 | Install occupancy sensors | $1,606 | $1,689 | |
| GT0932 #02 Y:2019 | 02 | 2019 | Insulate bare equipment | $495 | $382 | |
| GT0932 #01 Y:2019 | 01 | 2019 | Repair and eliminate steam leaks | $2,019 | $500 | |
| LE0457 #06 Y:2018 | 06 | 2018 | Use / purchase optimum sized compressor | $4,457 | $36,000 | |
| LE0457 #05 Y:2018 | 05 | 2018 | Replace existing hvac unit with high efficiency model | $2,689 | $13,000 | |
| LE0457 #04 Y:2018 | 04 | 2018 | Replace boiler | $33,772 | $150,000 | |
| LE0457 #03 Y:2018 | 03 | 2018 | Utilize higher efficiency lamps and/or ballasts | $2,771 | $10,041 | |
| LE0457 #02 Y:2018 | 02 | 2018 | Install compressor air intakes in coolest locations | $619 | $2,200 | |
| LE0457 #01 Y:2018 | 01 | 2018 | Utilize higher efficiency lamps and/or ballasts | $9,554 | $25,157 | |
| CL1804 #05 Y:2018 | 05 | 2018 | Use cooling tower or economizer to replace chiller cooling | $34,121 | $34,121 | |
| CL1804 #04 Y:2018 | 04 | 2018 | Use flow control valves on equipment to optimize water use | $39,409 | $3,050 | |
| CL1804 #03 Y:2018 | 03 | 2018 | Use waste heat from hot flue gases to preheat | $42,335 | $15,500 | |
| CL1804 #02 Y:2018 | 02 | 2018 | Utilize higher efficiency lamps and/or ballasts | $46,306 | $184,601 | |
| CL1804 #01 Y:2018 | 01 | 2018 | Utilize energy-efficient belts and other improved mechanisms | $156,853 | $28,500 |