Assessment Year | 2018 |
---|---|
Principal Product | Laminated vinyl |
NAICS | 313320: Fabric Coating Mills |
SIC | 2295: Coated Fabrics, Not Rubberized |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
160,000
ft2
|
Annual Production | 26,941,227
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $213,445 | 3,022,125 |
kWh
|
$0.071 |
Electricity Demand | $30,496 | 7,569 |
kW-mo/yr
|
$4.03 |
Electricity Fees | $29,124 | - |
|
- |
Natural Gas | $169,383 | 22,505 |
MMBtu
|
$7.53 |
TOTAL YEARLY COSTS | $442,448 | |||
RECOMMENDED SAVINGS* | $53,862 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,471 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,554 | $25,157 |
$7,841
110,430
kWh
|
$1,713
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $619 | $2,200 |
$534
7,524
kWh
|
$85
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,771 | $10,041 |
$2,086
29,384
kWh
|
$685
-
kW-mo/yr
|
- | |
04 | 2.1224: Replace boiler | $33,772 | $150,000 | - | - |
$33,772
-
MMBtu
|
|
05 | 2.7232: Replace existing hvac unit with high efficiency model | $2,689 | $13,000 |
$2,405
33,869
kWh
|
$284
-
kW-mo/yr
|
- | |
06 | 2.4226: Use / purchase optimum sized compressor | $4,457 | $36,000 |
$4,018
56,591
kWh
|
$439
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $53,862 | $236,398 |
$16,884
237,798
kWh
|
$3,206
-
kW-mo/yr
|
$33,772
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,471 | $84,198 |
$16,350
230,274
kWh
|
$3,121
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs