376
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0003 #08 Y:2007 | 08 | 2007 | Use compressor air filters | $1,524 | $400 | |
| TT0003 #07 Y:2007 | 07 | 2007 | Insulate bare equipment | $5,016 | $1,000 | |
| TT0003 #06 Y:2007 | 06 | 2007 | Recover waste heat from equipment | $3,379 | $1,500 | |
| TT0003 #05 Y:2007 | 05 | 2007 | Utilize higher efficiency lamps and/or ballasts | $250 | $450 | |
| TT0003 #04 Y:2007 | 04 | 2007 | Utilize higher efficiency lamps and/or ballasts | $1,406 | $5,360 | |
| TT0003 #03 Y:2007 | 03 | 2007 | Utilize higher efficiency lamps and/or ballasts | $38,338 | $42,670 | |
| TT0003 #02 Y:2007 | 02 | 2007 | Replace boiler | $1,896 | $15,000 | |
| TT0003 #01 Y:2007 | 01 | 2007 | Optimize plant power factor | $9,260 | $30,000 | |
| MZ0013 #03 Y:2007 | 03 | 2007 | Install compressor air intakes in coolest locations | $574 | $900 | |
| MZ0013 #02 Y:2007 | 02 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $51,740 | $80,000 | |
| MZ0013 #01 Y:2007 | 01 | 2007 | Use continuous equipment which retains process heating conveyors within the heated chamber | $78,456 | $300,000 | |
| NC0357 #05 Y:2006 | 05 | 2006 | Change rate schedules or other changes in utility service | $277 | $100 | |
| NC0357 #04 Y:2006 | 04 | 2006 | Utilize higher efficiency lamps and/or ballasts | $2,527 | $4,761 | |
| NC0357 #03 Y:2006 | 03 | 2006 | Develop a repair/replace policy | $699 | $375 | |
| NC0357 #02 Y:2006 | 02 | 2006 | Clean and maintain refrigerant condensers and towers | $16,558 | $5,600 | |
| NC0357 #01 Y:2006 | 01 | 2006 | Reduce the pressure of compressed air to the minimum required | $30,234 | $78,000 | |
| LM0121 #04 Y:2006 | 04 | 2006 | Insulate bare equipment | $3,734 | $3,100 | |
| LM0121 #03 Y:2006 | 03 | 2006 | Utilize higher efficiency lamps and/or ballasts | $5,390 | $10,233 | |
| LM0121 #02 Y:2006 | 02 | 2006 | Train operators for maximum operating efficiency | $91,500 | $200 | |
| LM0121 #01 Y:2006 | 01 | 2006 | Train operators for maximum operating efficiency | $183,000 | $2,160 |