Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

376

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Textile and fabric finishing and fabric coating mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0003 #08 Y:2007 Use compressor air filters $1,524 $400
TT0003 #07 Y:2007 Insulate bare equipment $5,016 $1,000
TT0003 #06 Y:2007 Recover waste heat from equipment $3,379 $1,500
TT0003 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $250 $450
TT0003 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $1,406 $5,360
TT0003 #03 Y:2007 Utilize higher efficiency lamps and/or ballasts $38,338 $42,670
TT0003 #02 Y:2007 Replace boiler $1,896 $15,000
TT0003 #01 Y:2007 Optimize plant power factor $9,260 $30,000
MZ0013 #03 Y:2007 Install compressor air intakes in coolest locations $574 $900
MZ0013 #02 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $51,740 $80,000
MZ0013 #01 Y:2007 Use continuous equipment which retains process heating conveyors within the heated chamber $78,456 $300,000
NC0357 #05 Y:2006 Change rate schedules or other changes in utility service $277 $100
NC0357 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $2,527 $4,761
NC0357 #03 Y:2006 Develop a repair/replace policy $699 $375
NC0357 #02 Y:2006 Clean and maintain refrigerant condensers and towers $16,558 $5,600
NC0357 #01 Y:2006 Reduce the pressure of compressed air to the minimum required $30,234 $78,000
LM0121 #04 Y:2006 Insulate bare equipment $3,734 $3,100
LM0121 #03 Y:2006 Utilize higher efficiency lamps and/or ballasts $5,390 $10,233
LM0121 #02 Y:2006 Train operators for maximum operating efficiency $91,500 $200
LM0121 #01 Y:2006 Train operators for maximum operating efficiency $183,000 $2,160