ITAC Assessment: LM0121
ITAC logo
ITAC Assessment: LM0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product dyed clothing
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $5
M
to 10
M
# of Employees 73
Plant Area 20,000
ft2
Annual Production 4,050,000
lb
Production Hrs. Annual 6,480
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,335 1,228,540
kWh
Electricity Demand $34,244 2,923
kW-mo/yr
Electricity Fees $13,945 -
Natural Gas $594,565 59,302
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $283,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,124

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings Increase in Production Savings
01 4.431: Train operators for maximum operating efficiency $183,000 $2,160 $2,260
38,392
kWh
- $18,580
-
MMBtu
$6,637
-
Tgal
$155,523
02 4.431: Train operators for maximum operating efficiency $91,500 $200 $2,260
38,392
kWh
- $18,580
-
MMBtu
$6,637
-
Tgal
$64,023
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,390 $10,233 $3,552
68,882
kWh
$1,838
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $3,734 $3,100 - - $3,734
-
MMBtu
- -
TOTAL RECOMMENDED $283,624 $15,693 $8,072
145,666
kWh
$1,838
-
kW-mo/yr
$40,894
-
MMBtu
$13,274
-
Tgal
$219,546
TOTAL IMPLEMENTED $9,124 $13,333 $3,552
68,882
kWh
$1,838
-
kW-mo/yr
$3,734
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs