ITAC Assessment: TT0003
ITAC logo
ITAC Assessment: TT0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Shirts and Jeans
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 70
Plant Area 44,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,579 813,000
kWh
Electricity Demand $31,535 3,026
kW-mo/yr
Electricity Fees $7,734 -
Natural Gas $83,949 7,321
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $9,260 $30,000 - $9,260 -
02 2.1224: Replace boiler $1,896 $15,000 - - $1,896
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $38,338 $42,670 $38,338
357,988
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,406 $5,360 $1,406
10,847
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $250 $450 $250
2,831
kWh
- -
06 2.2437: Recover waste heat from equipment $3,379 $1,500 - - $3,379
-
MMBtu
07 2.2511: Insulate bare equipment $5,016 $1,000 - - $5,016
-
MMBtu
08 2.4227: Use compressor air filters $1,524 $400 $1,524
19,242
kWh
- -
09 2.4239: Eliminate or reduce compressed air usage $2,592 $2,250 $2,592
25,920
kWh
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,574 $1,100 $11,574
115,740
kWh
- -
11 2.8121: Apply for tax-free status for energy purchases $4,824 - - $4,824 -
TOTAL RECOMMENDED $80,059 $99,730 $55,684
532,568
kWh
$14,084 $10,291
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs