ITAC Assessment: MZ0306
ITAC logo
ITAC Assessment: MZ0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Aluminum boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 477
Plant Area 365,727
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $441,333 6,101,840
kWh
Electricity Demand $170,438 20,163
kW-mo/yr
Natural Gas $490,460 43,587
MMBtu
Waste Disposal Costs
Water Usage $3,021 787
Tgal
Water Disposal $4,850 787
Tgal
TOTAL YEARLY COSTS $1,110,102
RECOMMENDED SAVINGS* $82,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $15,617 $50,190 $15,617
197,681
kWh
- -
02 2.2425: Use flue gases to heat process or service water $4,781 $18,650 - - $4,781
-
MMBtu
03 2.2437: Recover waste heat from equipment $35,350 $30,500 - - $35,350
-
MMBtu
04 2.7135: Install occupancy sensors $247 $870 $247
3,411
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,459 $17,421 $17,459
238,936
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $640 $160 $500
6,958
kWh
$140
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $8,283 $9,100 $6,425
91,639
kWh
$1,858
-
kW-mo/yr
-
TOTAL RECOMMENDED $82,377 $126,891 $40,248
538,625
kWh
$1,998
-
kW-mo/yr
$40,131
-
MMBtu
TOTAL IMPLEMENTED $247 $870 $247
3,411
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs