Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

376

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Textile and fabric finishing and fabric coating mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0889 #02 Y:2011 Repair or replace steam traps $14,795 $8,500
GT0889 #01 Y:2011 Analyze flue gas for proper air/fuel ratio $3,925 $1,000
TT0078 #05 Y:2011 Use outside cold water source as a supply of cooling water $15,241 $12,500
TT0078 #04 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $6,720 $800
TT0078 #03 Y:2011 Use / purchase optimum sized compressor $7,023 $1,480
TT0078 #02 Y:2011 Replace heat treating oven with more efficient unit $10,364 $5,531
TT0078 #01 Y:2011 Recover heat from exhausted steam, hot air or hot water $8,585 $29,500
TT0067 #01 Y:2011 Use waste heat from hot flue gases to preheat incoming fluids $303,919 $125,000
NC0407 #06 Y:2010 Utilize higher efficiency lamps and/or ballasts $2,776 $6,897
NC0407 #05 Y:2010 Reduce the pressure of compressed air to the minimum required $350 $50
NC0407 #04 Y:2010 Install outside air damper / economizer on hvac unit $10,147 $42,000
NC0407 #03 Y:2010 Analyze flue gas for proper air/fuel ratio $3,606 $1,000
NC0407 #02 Y:2010 Use waste heat steam for absorption refrigeration $35,567 $200,000
NC0407 #01 Y:2010 Use cooling tower or economizer to replace chiller cooling $13,128 $60,000
DL0052 #11 Y:2010 Reduce ventilation air $310 $585
DL0052 #10 Y:2010 Utilize controls to operate equipment only when needed $3,106 $495
DL0052 #09 Y:2010 Utilize energy-efficient belts and other improved mechanisms $3,650 $1,019
DL0052 #08 Y:2010 Install occupancy sensors $3,810 $560
DL0052 #07 Y:2010 Reduce illumination to minimum necessary levels $4,560 $200
DL0052 #06 Y:2010 Utilize higher efficiency lamps and/or ballasts $11,040 $720