ITAC Assessment: NC0407
ITAC logo
ITAC Assessment: NC0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Belting material
NAICS 313320: Fabric Coating Mills
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $50
M
to 100
M
# of Employees 215
Plant Area 65,000
ft2
Annual Production 6,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,299 4,860,000
kWh
Electricity Demand $35,544 11,864
kW-mo/yr
Natural Gas $365,185 44,054
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,574 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,657

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $13,128 $60,000 $12,845
236,208
kWh
$283
-
kW-mo/yr
- -
02 2.2693: Use waste heat steam for absorption refrigeration $35,567 $200,000 $32,889
604,800
kWh
$2,678
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,606 $1,000 - - $3,606
-
MMBtu
-
04 2.7241: Install outside air damper / economizer on hvac unit $10,147 $42,000 $9,031
166,064
kWh
$143
-
kW-mo/yr
- $973
05 2.4231: Reduce the pressure of compressed air to the minimum required $350 $50 $325
5,971
kWh
$25
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,776 $6,897 $2,835
52,128
kWh
$198
-
kW-mo/yr
- $(-257.0)
TOTAL RECOMMENDED $65,574 $309,947 $57,925
1,065,171
kWh
$3,327
-
kW-mo/yr
$3,606
-
MMBtu
$716
TOTAL IMPLEMENTED $29,657 $109,897 $24,711
454,400
kWh
$624
-
kW-mo/yr
$3,606
-
MMBtu
$716
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs