Assessment Year | 2010 |
---|---|
Principal Product | Belting material |
NAICS | 313320: Fabric Coating Mills |
SIC | 2295: Coated Fabrics, Not Rubberized |
Sales Range | $50 M to 100M |
# of Employees | 215 |
Plant Area |
65,000
ft2
|
Annual Production | 6,000
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $264,299 | 4,860,000 |
kWh
|
$0.054 |
Electricity Demand | $35,544 | 11,864 |
kW-mo/yr
|
$3.00 |
Natural Gas | $365,185 | 44,054 |
MMBtu
|
$8.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,574 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,657 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $13,128 | $60,000 |
$12,845
236,208
kWh
|
$283
-
kW-mo/yr
|
- | - | |
02 | 2.2693: Use waste heat steam for absorption refrigeration | $35,567 | $200,000 |
$32,889
604,800
kWh
|
$2,678
-
kW-mo/yr
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,606 | $1,000 | - | - |
$3,606
-
MMBtu
|
- | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $10,147 | $42,000 |
$9,031
166,064
kWh
|
$143
-
kW-mo/yr
|
- | $973 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $350 | $50 |
$325
5,971
kWh
|
$25
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,776 | $6,897 |
$2,835
52,128
kWh
|
$198
-
kW-mo/yr
|
- | $(-257.0) | |
TOTAL RECOMMENDED | $65,574 | $309,947 |
$57,925
1,065,171
kWh
|
$3,327
-
kW-mo/yr
|
$3,606
-
MMBtu
|
$716 | ||
TOTAL IMPLEMENTED | $29,657 | $109,897 |
$24,711
454,400
kWh
|
$624
-
kW-mo/yr
|
$3,606
-
MMBtu
|
$716 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs