Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

212

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Perishable prepared food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LT8400 #03 Y:2024 Use solar heat to make electricty $11,040 $26,888
LT8400 #02 Y:2024 Use or replace with energy efficient substitutes $749 $4,772
LT8400 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,402 $6,697
CI0022 #08 Y:2023 Install occupancy sensors $1,670 $1,125
CI0022 #07 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,547 $7,400
CI0022 #06 Y:2023 Recharge batteries on during off-peak demand periods $5,312 $50
CI0022 #05 Y:2023 Eliminate or reduce compressed air usage $10,784 -
CI0022 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $12,948 $300
CI0022 #03 Y:2023 Preheat combustion air with waste heat $17,839 $9,000
CI0022 #02 Y:2023 Replace fossil fuel equipment with electrical equipment $18,385 $60,000
CI0022 #01 Y:2023 Use solar heat to make electricty $30,795 $185,422
CI0017 #08 Y:2023 Preheat combustion air with waste heat $1,591 $5,000
CI0017 #07 Y:2023 Reduce the pressure of compressed air to the minimum required $6,491 -
CI0017 #06 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $11,433 $1,500
CI0017 #05 Y:2023 Use power during off-peak periods $12,483 $22,000
CI0017 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $21,971 $39,000
CI0017 #03 Y:2023 Replace boiler $25,947 $36,000
CI0017 #02 Y:2023 Replace fossil fuel equipment with electrical equipment $63,711 $90,000
CI0017 #01 Y:2023 Use solar heat to make electricty $271,104 $1,391,144
TR0042 #03 Y:2023 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $18,544 $6,243