| Assessment Year | 2025 |
|---|---|
| Principal Product | Salads |
| NAICS | 115114: Postharvest Crop Activities (except Cotton Ginning) |
| SIC | 0723: Crop Preparation Services for Market, Except Cotton Ginning |
| Sales Range | $10 M to 50M |
| # of Employees | 1,000 |
| Plant Area |
175,000
ft2
|
| Annual Production | 712,000,000
lb
|
| Production Hrs. Annual | 6,048
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $4,684,582 | 17,537,071 |
kWh
|
$0.27 | |
| Electricity Demand | $2,614,720 | 59,875 |
kW-mo/yr
|
$43.67 | |
| Waste Disposal Costs | |||||
| Water Usage | $757,637 | 126,956,480 |
Tgal
|
$0.006 | |
| Water Disposal | $956,805 | 221,216,836 |
Tgal
|
$0.004 | |
| TOTAL YEARLY COSTS | $9,013,744 | ||||
| RECOMMENDED SAVINGS* | $849,163 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $26,890 | - |
$26,890
227,896
kWh
|
- | - | - | - | - | |
| 02 | 2.7224: Reduce space conditioning during non-working hours | $15,996 | - |
$15,996
135,556
kWh
|
- | - | - | - | - | |
| 03 | 3.4154: Eliminate leaks in water lines and valves | $99,532 | $2,044 |
$19,439
164,737
kWh
|
- |
$46,656
-
Tgal
|
$33,437
-
Tgal
|
- | - | |
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $38,247 | $10,626 |
$38,247
324,135
kWh
|
- | - | - | - | - | |
| 05 | 2.2621: Modify refrigeration system to operate at a lower pressure | $285,746 | $93,750 |
$285,746
2,424,575
kWh
|
- | - | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,533 | $14,781 |
$7,169
60,756
kWh
|
$1,077
-
kW-mo/yr
|
- | - | $163 | $124 | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $131,400 | $376,158 |
$77,990
660,931
kWh
|
$53,410
-
kW-mo/yr
|
- | - | - | - | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,510 | $26,163 |
$3,267
27,691
kWh
|
$2,243
-
kW-mo/yr
|
- | - | - | - | |
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $87,783 | $439,056 |
$52,071
441,285
kWh
|
$35,712
-
kW-mo/yr
|
- | - | - | - | |
| 10 | 2.9114: Use solar heat to make electricty | $149,526 | $1,422,752 |
$149,526
1,289,019
kWh
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $849,163 | $2,385,330 |
$676,341
5,756,581
kWh
|
$92,442
-
kW-mo/yr
|
$46,656
-
Tgal
|
$33,437
-
Tgal
|
$163 | $124 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs