ITAC Assessment: DL0272
ITAC logo
ITAC Assessment: DL0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Pre-packaged greens, salads, tomatoes and apples
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 702
Plant Area 155,000
ft2
Annual Production 15,600,000
units
Production Hrs. Annual 5,200
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,601,794 10,431,103
kWh
Electricity Demand $283,641 20,684
kW-mo/yr
Electricity Fees $2,351 -
Natural Gas $46,825 2,710
MMBtu
Waste Disposal Costs
Water Usage $599,867 58,130
Tgal
TOTAL YEARLY COSTS $2,534,478
RECOMMENDED SAVINGS* $449,566 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Personnel Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $174,975 $104,000 $165,247
1,073,038
kWh
$9,728
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $26,591 $100,000 $21,979
142,720
kWh
$4,612
-
kW-mo/yr
- -
03 3.4151: Minimize water usage $248,000 $200,000 - - $48,000
-
Tgal
$200,000
TOTAL RECOMMENDED $449,566 $404,000 $187,226
1,215,758
kWh
$14,340
-
kW-mo/yr
$48,000
-
Tgal
$200,000
TOTAL IMPLEMENTED - - - - - -