ITAC Assessment: LE0605
ITAC logo
ITAC Assessment: LE0605
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Farm-to-table prepared meals and food services
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2032: Canned Specialties
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 9,575
ft2
Annual Production 400,000
units
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,587 523,355
kWh
Electricity Demand $48,700 1,489
kW-mo/yr
Electricity Fees $10,893 -
Natural Gas $24,050 2,132
MMBtu
TOTAL YEARLY COSTS $112,230
RECOMMENDED SAVINGS* $23,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $1,124 $1,120 $492
8,943
kWh
- $632
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,562 $2,185 $973
17,694
kWh
$589
-
kW-mo/yr
-
03 2.7425: Clean or color roof to reduce solar load $2,453 $7,474 $708
12,870
kWh
$2,029
-
kW-mo/yr
$(-284.0)
-
MMBtu
04 2.7232: Replace existing hvac unit with high efficiency model $11,122 $43,200 $6,122
111,297
kWh
$5,000
-
kW-mo/yr
-
05 2.7232: Replace existing hvac unit with high efficiency model $6,798 $33,750 $3,040
55,286
kWh
$2,484
-
kW-mo/yr
$1,274
-
MMBtu
TOTAL RECOMMENDED $23,059 $87,729 $11,335
206,090
kWh
$10,102
-
kW-mo/yr
$1,622
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs