Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,880

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0532 #01 Y:2007 Replace city water with recycled water via cooling tower $9,500 $6,500
SF0346 #08 Y:2007 Utilize higher efficiency lamps and/or ballasts $721 $1,875
SF0346 #07 Y:2007 Use waste heat from hot flue gases to preheat $96,586 $193,493
SF0346 #06 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $1,037 $1,863
SF0346 #05 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $8,090 $11,740
SF0346 #04 Y:2007 Install occupancy sensors $1,284 $1,620
SF0346 #03 Y:2007 Replace electrically-operated equipment with fossil fuel equipment $2,014 $1,859
SF0346 #02 Y:2007 Utilize controls to operate equipment only when needed $474 $262
SF0346 #01 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $1,744 $100
MI0155 #10 Y:2007 Use optimum size and capacity equipment $1,610 $3,010
MI0155 #09 Y:2007 Utilize energy-efficient belts and other improved mechanisms $1,909 $180
MI0155 #08 Y:2007 Reduce the pressure of compressed air to the minimum required $4,179 $30
MI0155 #07 Y:2007 Use excess cold process fluid for industrial cooling needs $7,524 $7,800
MI0155 #06 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $13,760 $1,074
MI0155 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $14,901 $27,300
MI0155 #04 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $16,549 $23,640
MI0155 #03 Y:2007 Install vinyl strip / high speed / air curtain doors $31,061 $2,665
MI0155 #02 Y:2007 Install vinyl strip / high speed / air curtain doors $51,399 $22,558
MI0155 #01 Y:2007 Utilize a less expensive cooling method $66,401 $120,000
IC0125 #12 Y:2006 Maintain air filters by cleaning or replacement $1,563 -