ITAC Assessment: MI0155
ITAC logo
ITAC Assessment: MI0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Processed Fresh Produce
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 380
Plant Area 90,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $582,404 7,524,000
kWh
Electricity Demand $45,809 13,305
kW-mo/yr
Electricity Fees $93,390 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $209,293 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings
01 2.2628: Utilize a less expensive cooling method $66,401 $120,000 - - $66,401
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $51,399 $22,558 $48,515
537,265
kWh
$2,884
-
kW-mo/yr
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $31,061 $2,665 $29,034
362,925
kWh
$2,027
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,549 $23,640 $15,469
185,926
kWh
$1,080
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,901 $27,300 $14,065
155,750
kWh
$836
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,760 $1,074 $13,679
160,925
kWh
$81
-
kW-mo/yr
-
07 2.2696: Use excess cold process fluid for industrial cooling needs $7,524 $7,800 $7,032
87,900
kWh
$492
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $4,179 $30 $4,004
47,104
kWh
$175
-
kW-mo/yr
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,909 $180 $1,547
19,336
kWh
$362
-
kW-mo/yr
-
10 2.4323: Use optimum size and capacity equipment $1,610 $3,010 $1,514
17,816
kWh
$96
-
kW-mo/yr
-
TOTAL RECOMMENDED $209,293 $208,257 $134,859
1,574,947
kWh
$8,033
-
kW-mo/yr
$66,401
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs