ITAC Assessment: AM0532
ITAC logo
ITAC Assessment: AM0532
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Snack foods
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $100
M
to 500
M
# of Employees 285
Plant Area 157,000
ft2
Annual Production 75,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $537,836 13,894,560
kWh
Electricity Demand $171,567 25,655
kW-mo/yr
Electricity Fees $44,421 -
Natural Gas $1,937,301 208,095
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Consumption Savings
01 3.4114: Replace city water with recycled water via cooling tower $9,500 $6,500 - - $9,500
-
Tgal
02 2.4239: Eliminate or reduce compressed air usage $3,100 - $2,400
51,000
kWh
$700
-
kW-mo/yr
-
03 2.7229: Air condition only space necessary $1,700 $5,200 $1,300
27,000
kWh
$400
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $670 $285 $500
10,600
kWh
$170
-
kW-mo/yr
-
05 2.7131: Add area lighting switches $320 $65 $320
6,800
kWh
- -
TOTAL RECOMMENDED $15,290 $12,050 $4,520
95,400
kWh
$1,270
-
kW-mo/yr
$9,500
-
Tgal
TOTAL IMPLEMENTED $13,590 $6,850 $3,220
68,400
kWh
$870
-
kW-mo/yr
$9,500
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs