Assessment Year | 2016 |
---|---|
Principal Product | Aluminum and Titanium Aerospace Forging |
NAICS | 332112: Nonferrous Forging |
SIC | 3463: Nonferrous Forgings |
Sales Range | $100 M to 500M |
# of Employees | 520 |
Plant Area |
960,000
ft2
|
Annual Production | 700
units
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,604,569 | 23,805,339 |
kWh
|
$0.067 |
Electricity Demand | $432,586 | 49,517 |
kW-mo/yr
|
$8.74 |
Electricity Fees | $166,150 | - |
|
- |
Natural Gas | $1,273,786 | 342,856 |
MMBtu
|
$3.72 |
TOTAL YEARLY COSTS | $3,477,091 | |||
RECOMMENDED SAVINGS* | $90,857 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,555 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $29,703 | $94,750 | - | - | $29,703 | - | |
02 | 2.1116: Improve combustion control capability | $17,613 | $46,250 | - | - | - |
$17,613
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,549 | $26,272 |
$14,794
219,490
kWh
|
$2,755
-
kW-mo/yr
|
- | - | |
04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $12,722 | $54,880 |
$7,067
104,820
kWh
|
$5,655
-
kW-mo/yr
|
- | - | |
05 | 2.2511: Insulate bare equipment | $5,664 | $2,520 | - | - | - |
$5,664
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,200 | $13,950 |
$4,259
63,345
kWh
|
$941
-
kW-mo/yr
|
- | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $952 | $750 |
$952
14,213
kWh
|
- | - | - | |
08 | 2.4133: Use most efficient type of electric motors | $877 | $1,988 |
$719
10,667
kWh
|
$158
-
kW-mo/yr
|
- | - | |
09 | 2.4239: Eliminate or reduce compressed air usage | $577 | $1,000 |
$419
6,211
kWh
|
$158
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $90,857 | $242,360 |
$28,210
418,746
kWh
|
$9,667
-
kW-mo/yr
|
$29,703 |
$23,277
-
MMBtu
|
||
TOTAL IMPLEMENTED | $47,555 | $90,742 |
$20,424
303,259
kWh
|
$3,854
-
kW-mo/yr
|
- |
$23,277
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs