Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,961

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0272 #01 Y:2026 Install vinyl strip / high speed / air curtain doors $174,975 $104,000
SF0649 #11 Y:2026 Use solar heat to make electricty $241,826 $1,576,614
SF0649 #10 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $6,422 $29,062
SF0649 #09 Y:2026 Make a practice of turning off lights when not needed $788 $2,785
SF0649 #08 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $16,383 $49,958
SF0649 #07 Y:2026 Utilize controls to operate equipment only when needed $1,544 $4,130
SF0649 #06 Y:2026 Insulate bare equipment $38,998 $38,922
SF0649 #05 Y:2026 Reduce space conditioning during non-working hours $5,987 $5,606
SF0649 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $11,258 $6,264
SF0649 #03 Y:2026 Analyze flue gas for proper air/fuel ratio $2,578 -
SF0649 #02 Y:2026 Eliminate or reduce compressed air usage $3,116 $220
SF0649 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $9,092 -
UL2603 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $10,696 $20,685
UL2603 #06 Y:2026 Reduce illumination to minimum necessary levels $7,891 -
UL2603 #05 Y:2026 Use solar heat to make electricty $102,792 $1,093,593
UL2603 #04 Y:2026 Lower ceiling to reduce conditioned space $16,549 $21,600
UL2603 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $51,923 $8,888
UL2603 #02 Y:2026 Optimize plant power factor $146,871 $41,841
UL2603 #01 Y:2026 Use outside cold water source as a supply of cooling water $51,560 $583,665
UL2602 #06 Y:2026 Use solar heat to make electricty $45,457 $471,029