1,956
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SF0649 #07 Y:2026 | 07 | 2026 | Utilize controls to operate equipment only when needed | $1,544 | $4,130 |
n/a
|
| SF0649 #06 Y:2026 | 06 | 2026 | Insulate bare equipment | $38,998 | $38,922 |
n/a
|
| SF0649 #05 Y:2026 | 05 | 2026 | Reduce space conditioning during non-working hours | $5,987 | $5,606 |
n/a
|
| SF0649 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $11,258 | $6,264 |
n/a
|
| SF0649 #03 Y:2026 | 03 | 2026 | Analyze flue gas for proper air/fuel ratio | $2,578 | - |
n/a
|
| SF0649 #02 Y:2026 | 02 | 2026 | Eliminate or reduce compressed air usage | $3,116 | $220 |
n/a
|
| SF0649 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,092 | - |
n/a
|
| UL2603 #07 Y:2026 | 07 | 2026 | Utilize higher efficiency lamps and/or ballasts | $10,696 | $20,685 |
n/a
|
| UL2603 #06 Y:2026 | 06 | 2026 | Reduce illumination to minimum necessary levels | $7,891 | - |
n/a
|
| UL2603 #05 Y:2026 | 05 | 2026 | Use solar heat to make electricty | $102,792 | $1,093,593 |
n/a
|
| UL2603 #04 Y:2026 | 04 | 2026 | Lower ceiling to reduce conditioned space | $16,549 | $21,600 |
n/a
|
| UL2603 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $51,923 | $8,888 |
n/a
|
| UL2603 #02 Y:2026 | 02 | 2026 | Optimize plant power factor | $146,871 | $41,841 |
n/a
|
| UL2603 #01 Y:2026 | 01 | 2026 | Use outside cold water source as a supply of cooling water | $51,560 | $583,665 |
n/a
|
| UL2602 #06 Y:2026 | 06 | 2026 | Use solar heat to make electricty | $45,457 | $471,029 |
n/a
|
| UL2602 #05 Y:2026 | 05 | 2026 | Recover waste heat from equipment | $49,774 | $105,000 |
n/a
|
| UL2602 #04 Y:2026 | 04 | 2026 | Install / repair insulation on steam lines | $5,603 | $2,318 |
n/a
|
| UL2602 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $3,036 | $16,250 |
n/a
|
| UL2602 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $6,663 | - |
n/a
|
| UL2602 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,840 | $1,337 |
n/a
|