| Assessment Year | 2026 |
|---|---|
| Principal Product | Food Products |
| NAICS | 311999: All Other Miscellaneous Food Manufacturing |
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 300 |
| Plant Area |
197,113
ft2
|
| Annual Production | 11,520,083
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $947,541 | 29,534,400 |
kWh
|
$0.032 |
| Electricity Demand | $1,373,747 | 57,633 |
kW-mo/yr
|
$23.84 |
| Electricity Fees | $127,777 | - |
|
- |
| Natural Gas | $538,089 | 121,105 |
MMBtu
|
$4.44 |
| TOTAL YEARLY COSTS | $2,987,154 | |||
| RECOMMENDED SAVINGS* | $407,586 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2692: Use outside cold water source as a supply of cooling water | $70,864 | $583,665 |
$29,592
921,873
kWh
|
$21,968
-
kW-mo/yr
|
- |
$19,304
-
Tgal
|
|
| 02 | 2.3212: Optimize plant power factor | $146,871 | $41,841 | - | - | $146,871 | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $51,923 | $8,888 |
$51,923
1,617,552
kWh
|
- | - | - | |
| 04 | 2.7292: Lower ceiling to reduce conditioned space | $16,549 | $21,600 |
$16,549
515,815
kWh
|
- | - | - | |
| 05 | 2.9114: Use solar heat to make electricty | $102,792 | $1,093,593 |
$42,858
1,334,138
kWh
|
$59,934
-
kW-mo/yr
|
- | - | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $7,891 | - |
$3,829
119,280
kWh
|
$4,062
-
kW-mo/yr
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,696 | $20,685 |
$3,534
110,109
kWh
|
$7,162
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $407,586 | $1,770,272 |
$148,285
4,618,767
kWh
|
$93,126
-
kW-mo/yr
|
$146,871 |
$19,304
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs