ITAC Assessment: SD0357
ITAC logo
ITAC Assessment: SD0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product fiberglass tubs and showers
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3088: Plastics Plumbing Fixtures
Sales Range $10
M
to 50
M
# of Employees 262
Plant Area 95,520
ft2
Annual Production 180,000
pieces
Production Hrs. Annual 6,024
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,512 2,908,836
kWh
Electricity Demand $56,012 5,846
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $987,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $638,017

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2437: Recover waste heat from equipment $416,473 $750,000 - - $66,473
-
MMBtu
- - $350,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,472 $10,980 $2,696
40,722
kWh
$776
-
kW-mo/yr
- - - -
03 3.5311: Recover and reuse waste material $31,776 $50,000 - - - $31,776
-
lb
- -
04 4.446: Automate finishing process $314,336 $500,000 - - - - $314,336 -
05 4.446: Automate finishing process $189,416 $450,000 - - - - $189,416 -
06 4.444: Install system to collect scrap $32,128 $29,639 - - - - - $32,128
TOTAL RECOMMENDED $987,601 $1,790,619 $2,696
40,722
kWh
$776
-
kW-mo/yr
$66,473
-
MMBtu
$31,776
-
lb
$503,752 $382,128
TOTAL IMPLEMENTED $638,017 $1,229,639 - - $66,473
-
MMBtu
- $189,416 $382,128
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs