| Assessment Year | 2005 |
|---|---|
| Principal Product | fiberglass tubs and showers |
| NAICS | 326191: Plastics Plumbing Fixture Manufacturing |
| SIC | 3088: Plastics Plumbing Fixtures |
| Sales Range | $10 M to 50M |
| # of Employees | 262 |
| Plant Area |
95,520
ft2
|
| Annual Production | 180,000
pieces
|
| Production Hrs. Annual | 6,024
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $192,512 | 2,908,836 |
kWh
|
$0.066 |
| Electricity Demand | $56,012 | 5,846 |
kW-mo/yr
|
$9.58 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $987,601 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $638,017 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $416,473 | $750,000 | - | - |
$66,473
-
MMBtu
|
- | - | $350,000 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,472 | $10,980 |
$2,696
40,722
kWh
|
$776
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 3.5311: Recover and reuse waste material | $31,776 | $50,000 | - | - | - |
$31,776
-
lb
|
- | - | |
| 04 | 4.446: Automate finishing process | $314,336 | $500,000 | - | - | - | - | $314,336 | - | |
| 05 | 4.446: Automate finishing process | $189,416 | $450,000 | - | - | - | - | $189,416 | - | |
| 06 | 4.444: Install system to collect scrap | $32,128 | $29,639 | - | - | - | - | - | $32,128 | |
| TOTAL RECOMMENDED | $987,601 | $1,790,619 |
$2,696
40,722
kWh
|
$776
-
kW-mo/yr
|
$66,473
-
MMBtu
|
$31,776
-
lb
|
$503,752 | $382,128 | ||
| TOTAL IMPLEMENTED | $638,017 | $1,229,639 | - | - |
$66,473
-
MMBtu
|
- | $189,416 | $382,128 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs